Sunday, December 04, 2016

Holocaust Monument Under Construction December 4, 2016

The construction of the Holocaust Monument seems to continue. I'm not so sure about pouring concrete in lower temperatures but it looks like more has been added to the structure.














Monday, November 07, 2016

LeBreton Park Area Update

On the south side of Sir John A MacDonald Parkway between Lett Street and Preston Street, it looks like the park development is very close to completion. I photographed it on Sunday, November 6, 2016.











This structure has a concrete map with Ottawa streets named on it. There are
bolts sticking up from small concrete bases. The round stone in the circle
looks like a plinth for something. I guess we'll see what it's all about
come the spring.













Holocaust Monument Under Construction November 6, 2016

I took some pictures of the Holocaust Monument again on Sunday. The structure is taking shape. I can't say what's in the pictures. All I can say is there's more there now than before.